HV/LV Services: Hospital Refurbishment
Quartzelec enables hospital to maintain full operational status whilst 996 RAAC panels are replaced in one of first NHS upgrades.
READ MOREQuartzelec enables hospital to maintain full operational status whilst 996 RAAC panels are replaced in one of first NHS upgrades.
READ MOREQuartzelec installs LV supply to enable generator connection for intrusive switchgear maintenance programme
READ MOREQuartzelec provides onsite LV final circuit testing for Group 2 | 1 | 0 medical locations
READ MOREQuartzelec undertakes intrusive switchgear maintenance supplying key, critical locations within the hospital as part of a planned preventative maintenance programme
READ MOREQuartzelec assists a large North West Hospital back up to full power following failure of an ageing LV Air Circuit Breaker which left power supply on-site at only 60%
READ MOREHV/LV Installation for Wrightington, Wigan & Leigh NHS Foundation Trust
READ MORE